
Kitchen tear-outs
Kitchen Demolition in Gilroy
We clear out old kitchens across Gilroy and Morgan Hill so the remodel starts on an empty room. Cabinets, counters, tile, soffits and appliances go out, and gas, water and power are made safe first.
Kitchen Tear-Outs in Gilroy Homes
A kitchen demolition is mostly a matter of order. Appliances go first, then the countertops, then the upper and lower cabinets, then the soffits, backsplash and flooring. If your remodel opens the kitchen to the family room, the partition wall comes out last, once the plans and the framing above it have been checked.
Gilroy kitchens come in a few common forms. The 1990s and 2000s homes in Northwest Gilroy and Glen Loma Ranch often have oak cabinets, tile or laminate counters and builder-grade vinyl or tile floors. Older homes and farmhouses may have site-built cabinets, plaster walls, several layers of linoleum and a mortar bed under the tile, which takes longer to break up.

Utility Shutoffs Before Kitchen Demolition
Kitchens hold the most utility connections in the house, so this step matters. A qualified trade closes the range's gas supply and caps it. Circuits for the range, dishwasher, disposal and lighting are turned off at the panel. Supply lines and the drain are shut and capped, and the refrigerator water line is closed.
In houses on wells, the water side can be a little different. Pressure tanks and filters sometimes sit near the kitchen or in an attached utility room, and we trace what feeds what before cutting anything, so the rest of the house keeps running water during the remodel. On propane homes outside town, the tank valve is shut before the range line is disconnected.
Asbestos in Older Gilroy Kitchens
Older kitchens are a common place to find asbestos. Sheet vinyl and the black mastic under it, nine-inch floor tiles, textured ceilings and some old joint compound can contain it. An asbestos survey is done before demolition, and anything that tests positive is cleared by certified abatement specialists we book, before our crew begins.
Newer kitchens built after the 1980s are less likely to have it, but some products still turn up, so the survey is the only way to be sure. Lead paint on trim and window casings in pre-1978 homes is handled with lead-safe methods.

What Kitchen Demolition Costs in Gilroy
Kitchen demo is priced by the work, not a flat rate. Size and layout matter, but the materials matter more. Stone counters are heavy and slow to move out. Tile set on a mortar bed takes longer to remove than tile on backer board. Multiple layers of old flooring add hours.
Other factors include how far the kitchen is from the nearest exit door, whether we can park a truck in the driveway or need a bin, whether any walls are coming out, and how much of the old cabinetry you want saved. Abatement, if needed, is a separate cost from the abatement contractor.
Timing with the rest of the remodel also matters. If cabinets are on order with a long lead time, it can make sense to wait on demolition so the family is not without a kitchen for weeks. We can schedule the tear-out close to the install date your contractor gives you.
What Our Kitchen Demolition Includes in Gilroy
Appliance and Cabinet Removal
Range, hood, dishwasher, refrigerator and built-in microwave come out first, followed by uppers, lowers and pantry units. Cabinets in good shape can be pulled whole so you can reuse them in a garage or donate them.
Countertop and Backsplash Removal
Granite, quartz, tile and laminate counters are cut or lifted off, and the backsplash is stripped to the wall. Heavy stone is moved with carts and straps so floors and doorways in the rest of the house are protected.
Flooring Tear-Out to Subfloor
Tile, vinyl, laminate and old linoleum are removed down to the subfloor or slab, including mortar beds and leveling layers. We scrape the slab or check the plywood so your installer knows what they are starting with.
Kitchen Debris Haul-Off
All the debris leaves the property the same day or goes into a bin we place and pull. Metal from appliances and sinks goes to scrap, and the rest is sorted to cut down what ends up as mixed waste.
Kitchen Demolition: Job Site Photos



Kitchen Demolition Across Gilroy
Demolition FAQs
Kitchen Demo Questions From Gilroy Homeowners
How long is the kitchen out of commission?
Most single-family kitchens in Gilroy take one to two days. Stone counters, mortar-bed tile and wall removal can push that longer. Abatement, if the survey finds asbestos, happens before we start and is scheduled separately.
Can the old cabinets be saved?
Usually, if they are solid and you mention it before demolition day. We unscrew and lift them out instead of breaking them, and set them in the garage or a spot you choose.
Who disconnects the gas range?
The gas is shut off and the line capped by a qualified trade before we move the range. If your remodel contractor has a plumber on the job, they often handle it, otherwise we coordinate it.
Will you remove the wall between the kitchen and family room?
If it is in the approved plans and the framing above has been checked, yes. Bearing walls need a beam or other support designed by your engineer before they come out, and that work usually happens with the framer.

Demolition quote
Price Your Gilroy Kitchen Tear-Out
Note the kitchen size, the counter material and anything you want saved. Expect a reply inside 24 hours to set a time to look.
- Permits
- Demolition
- Haul-off
